Electronics engineering for teams in New Delhi.
Make a product or supplier change with the design in view.
For OEM and product teams in New Delhi, TekRabbits connects electronics redesign, component decisions and manufacturing handover. Start with what must stay compatible and what the next version or supplier route needs to improve.
Document the existing product and design requirement
Record the product function, interfaces and operating behaviour before changing the route. Available files, samples, known issues and required compatibility establish the starting point for an assessment.
- Current function and interface requirements
- Available design files and sample units
- Known issues and desired improvements
- Compatibility and change boundaries

Review component and supplier-transition decisions
A different component or supplier can affect electronics, firmware, assembly and test. Review those effects together and identify the information needed to evaluate a proposed alternative.
- Component and BOM assumptions
- Electrical and firmware implications
- Assembly and test differences
- Information, licence and ownership boundaries

Agree the product and manufacturing handoff
Define the files, versions and review outputs required for the next build. An identifiable release package helps the team understand what has changed and what still needs assessment before a larger commitment.
- Design and configuration versions
- Build and test information
- Evaluation findings and unresolved issues
- Release and later-change responsibilities

Coordinate the next review.
Share the project location in New Delhi, the current stage and the material available for review. Agree how design files, sample hardware and any site-dependent work will be handled as part of the scope. For project enquiries, call +91-7439990110 or email sales@tekrabbits.com.
Questions about engineering support in New Delhi
What is useful before changing an electronics supplier?
Collect the relevant design revision, BOM, firmware/configuration, assembly and test information, known issues and required compatibility. Agree access and evaluation responsibilities before the transition build.
How should our New Delhi team start the discussion?
Share the product function, current stage, available design information and the next milestone. Include constraints on review access, sample hardware or site work so the initial scope reflects how the project will be coordinated.
Can we begin with a PCB fabrication or assembly requirement?
Yes. Use the PCB fabrication or PCBA order route for a defined build. If the files, component choices or test information need engineering review first, describe that work in the project brief.
Continue your project
Make the next milestone a useful one.
Tell us what exists today, what needs to change and the decision your team needs to make. We’ll connect the discussion with the relevant engineering scope.

